This building was started in November 2002 with the raising of the bents. |
 |
Group of folks raising up the 1st story bents for the timberframe structure.
|
 |
Roofing the three-story timberframe.
|
 |
Digging the basement for the timberframe project.
|
 |
Installing windows and doors on the timberframe project.
|
 |
Finished timberframe.
|
 |
Finished timberframe from the back.
|
Mihaly Bartalos, 828-669-3822,
|